Clear the path. With certainty.

Targeted intrusive testing to confirm that boreholes and pile locations are free from unexploded ordnance, providing the confidence your piling contractor needs to proceed.

  • Fast mobilisation
  • Same-week scheduling
  • UK-wide coverage

Get in touch

We respond within 24 hours. Direct contact with a senior engineer, no call centres.

No spam No obligation CIRIA C681 compliant

By submitting you agree to our Privacy Policy. We'll only use your details to respond to your enquiry.

Accredited
& compliant
View →

Trusted by leading developers, contractors & authorities

  • London Square
  • NG Bailey
  • Kier
  • Balfour Beatty
  • Thames Water
  • Galliford Try
  • Plymouth Argyle
What's included

Position-by-position clearance. Certified.

Our borehole clearance service provides targeted, high-confidence confirmation that key structural locations are UXO-free before your piling programme begins.

  • Borehole Magnetometry Logging

    Magnetometer probe advanced within each borehole to detect buried ferrous anomalies, providing reliable data at depth.

  • Pile Position Sign-off

    Each position formally investigated and certificated, giving your piling contractor the documented clearance needed to proceed.

  • CPT Integration

    Where deeper investigation is required, our CPT rig can be integrated to provide additional confidence at depth.

  • Rapid Deployment

    Typically mobilised within 5 working days of instruction, structured around your piling programme to avoid delays.

  • CIRIA C681 Compliant

    All works designed, executed, and reported in full compliance with CIRIA C681, accepted by planning authorities and CDM coordinators.

  • Senior Engineer Sign-off

    Clearance certificates issued by a chartered engineer for every position. Suitable for inclusion in your pre-construction H&S file.

When you need one

Piling programme? Start with confidence.

Borehole clearance is required wherever deep ground disturbance is planned on sites with a UXO risk rating above LOW.

  • Pre-piling clearance

    Your risk assessment has returned MEDIUM or above and your piling contractor won't mobilise without a UXO clearance certificate.

  • Planning condition

    A planning authority has attached a condition requiring UXO clearance at individual pile positions before groundworks commence.

  • Combined UXO and GI scope

    You need a joint UXO and geotechnical investigation to reduce programme duplication and cost before main works begin.

  • Sound like you?

    We'll clear your pile positions and issue certificates, structured around your piling programme and mobilised within 5 working days.

How We Work

A pragmatic four-step process, designed for construction deadlines.

No bureaucracy, no junior handovers, no waiting for a project manager to call you back. Senior engineers from enquiry to delivery.

  1. 01

    Enquiry

    Tell us about your site. We confirm scope, price, and turnaround inside one working hour.

  2. 02

    Research

    Historic records review, bombing density analysis, and site-specific risk profiling.

  3. 03

    Report

    CIRIA C681-compliant report with clear risk rating, evidence, and recommended mitigations.

  4. 04

    Delivery

    Delivered within 24 hours. Senior engineer available for follow-up calls and clarifications.

Borehole Clearance

Quoted on scope

Priced per pile position. Efficient scheduling to suit your programme.

  • Borehole magnetometry log for each position
  • Individual pile position clearance certificates
  • Georeferenced pile position schedule
  • CIRIA C681-compliant methodology statement
  • Anomaly records and investigation logs
  • Recommendations for follow-up where required
  • Senior engineer sign-off
Pricing

Transparent pricing. No surprises.

Priced by number of positions, depth, and site conditions. Fixed fee quoted within one working hour of your enquiry. No surprises mid-programme.

FAQs

Frequently asked questions

  • A site-wide surface magnetometry survey provides area coverage but cannot guarantee that every individual pile position to full foundation depth is clear. Borehole clearance uses a downhole magnetometer probe to scan each specific pile location from surface to the assessed maximum bomb penetration depth (typically 12 metres in soft ground), providing point-specific assurance before the piling rig engages. This is the definitive check that protects the piling crew and the pile driving equipment.

  • For each borehole or pile position, the first metre is hand-excavated to remove near-surface clutter and establish a clean entry point. A downhole magnetometer probe is then lowered into the hole at one-metre intervals, logging magnetic data at each stage. If no significant anomalies are detected at any depth, that position is signed off as clear and the piling crew can proceed immediately. The process is typically programmed to run directly ahead of the piling rig, keeping the critical path moving.

  • As a general guide, an experienced operative using a downhole magnetometer can clear between 20 and 40 positions per day on a straightforward site with clear access. Where anomalies are encountered and require investigation, progress slows, but real-time feedback from the probe means decisions can be made immediately without waiting for off-site data processing.

  • If the probe detects a significant ferrous anomaly, drilling at that position stops and the finding is logged. The UXO engineer will recommend either relocating the pile within the structural engineer's tolerance, or initiating a Target Investigation: a supervised excavation to identify the object. The vast majority of anomalies prove to be innocuous, but each must be assessed before work resumes at that position.

  • Yes, and this is often the most cost-efficient approach. A combined magnetometer-and-piezocone probe surveys UXO risk and ground geotechnical properties simultaneously in a single pass, producing both a UXO clearance log and soil stratigraphy data. This avoids the need for separate mobilisations and is particularly valuable on projects where ground investigation and UXO assessment are both at an early stage.

  • Each cleared position receives an individual borehole clearance log, and a summary clearance report is produced at the end of the programme. These documents confirm that UXO risk has been managed to ALARP at each signed-off location and are accepted as the standard record for piling contractors, structural engineers, geotechnical consultants, and CDM documentation. They form part of the site's permanent health and safety file.

S.I UXO has supported a range of our projects, including active and former MOD facilities. They deliver agreed scopes effectively and operate both professionally and with clear intent to minimise any disruption to ongoing works.

David Pethica /Director, Ground Condition Consultants Ltd

I've been impressed with S.I UXO's work attitude and quality. They have incredibly worked well with our site engineers and drillers, ensuring minimal disruption to our ground investigation works. I will certainly be using S.I UXO in the future.

Niall Kiernan /Project Manager, SOCOTEC UK Ltd

I've had the pleasure of working with S.I UXO over the past two years, I can confidently say that their performance has been nothing short of exemplary. I highly recommend S.I UXO for any UXO project that demands the utmost in reliability and professionalism.

Paul Standish /Associate Director, Terra Firma Group

Ready to de-risk your site?

Whether you need a 24-hour Preliminary Risk Assessment, a full survey, or just advice on your site; start with a conversation.

  • Fast mobilisation
  • Same-week scheduling
  • UK-wide coverage

Clear your pile positions with same-week borehole UXO clearance across the UK.