Consultancy & Supervision

Expert oversight. Every step of the way.

UXO risk management consultancy and on-site supervision, from initial project planning through to post-clearance handback. Pragmatic guidance, fully aligned to CIRIA C681.

  • Senior engineers, start to finish
  • CIRIA C681 compliant
  • UK-wide coverage

Get in touch

We respond within 24 hours. Direct contact with a senior engineer, no call centres.

No spam No obligation CIRIA C681 compliant

By submitting you agree to our Privacy Policy. We'll only use your details to respond to your enquiry.

Accredited
& compliant
View →

Trusted by leading developers, contractors & authorities

  • London Square
  • NG Bailey
  • Kier
  • Balfour Beatty
  • Thames Water
  • Galliford Try
  • Plymouth Argyle
What's included

Specialist oversight. Built into your programme.

Our consultancy and supervision services ensure UXO risk is managed proactively throughout your project, not just at the assessment stage.

  • UXO Watching Brief

    Qualified UXO engineer on site during excavation or piling, monitoring for ordnance and ready to act if a find is made.

  • Toolbox Talks

    Structured pre-start briefings for all site operatives, covering UXO awareness, recognition, and emergency reporting procedures.

  • Risk Mitigation Strategy

    Project-specific UXO risk management plan, tailored to your scope of works, programme, and ground conditions.

  • CDM & HSE Compliance Support

    Technical documentation to satisfy your Principal Designer, CDM co-ordinator, and HSE pre-construction information requirements.

  • Third-Party Report Review

    Independent technical review of UXO assessments produced by others, ensuring reports are accurate, compliant, and fit for purpose.

  • Post-Clearance Reporting

    Full documentation of all UXO works undertaken, suitable for planning discharge, client records, and future due diligence.

When you need one

Groundworks starting? Don't go in blind.

Consultancy and supervision are required wherever intrusive works are planned on sites with a UXO risk above LOW, or where a qualified engineer must oversee ground disturbance.

  • Watching brief required

    Your risk assessment or planning condition requires a qualified UXO engineer present during excavation or piling works.

  • Third-party report review

    You've received a UXO assessment from another provider and want an independent review before committing to mitigation.

  • CDM compliance

    Your Principal Designer requires documented UXO risk management as part of the pre-construction health and safety file.

  • Sound like you?

    Our engineers are available for watching briefs, toolbox talks, and project consultancy across the UK. Typically mobilised within 2 working days.

How We Work

A pragmatic four-step process, designed for construction deadlines.

No bureaucracy, no junior handovers, no waiting for a project manager to call you back. Senior engineers from enquiry to delivery.

  1. 01

    Enquiry

    Tell us about your site. We confirm scope, price, and turnaround inside one working hour.

  2. 02

    Research

    Historic records review, bombing density analysis, and site-specific risk profiling.

  3. 03

    Report

    CIRIA C681-compliant report with clear risk rating, evidence, and recommended mitigations.

  4. 04

    Delivery

    Delivered within 24 hours. Senior engineer available for follow-up calls and clarifications.

Consultancy & Supervision

Quoted on scope

Fixed-fee and day-rate options available.

  • UXO risk mitigation strategy document
  • Site-specific watching brief record sheets
  • Toolbox talk delivery records
  • CDM/HSE compliance documentation
  • Third-party report review and commentary
  • Emergency response procedure documentation
  • Post-works summary report
Pricing

Transparent pricing. No surprises.

Priced by scope, duration, and engineer days required. Fixed-fee and day-rate options available. Rates provided within one hour of your enquiry.

FAQs

Frequently asked questions

  • A watching brief involves a qualified EOD engineer being present on site during intrusive ground works (excavations, trenching, demolition, trial pits) to monitor for suspected ordnance in real time and respond immediately if anything is uncovered. It is recommended when a risk assessment has identified moderate to high risk, when works are in an area of known wartime activity, or when a client requires a demonstrable live safety presence. The engineer does not slow the work down; they observe, assess, and intervene only if necessary.

  • A completed survey significantly reduces uncertainty, but it cannot guarantee that every cubic metre of soil is ordnance-free — particularly in areas of variable ground or where survey coverage was limited. A watching brief provides a safety net during the actual act of excavation, when ordnance is most likely to be disturbed. The two services are complementary: survey work reduces the probability of an encounter; a watching brief manages the consequences if one occurs despite the survey.

  • A UXO toolbox talk is a short, structured briefing delivered by a specialist to all ground workers and machine operators on site. It covers the ordnance likely to be encountered based on the site-specific risk assessment, how to recognise suspicious items, the critical "do not touch" rule, who to call, and the site's emergency procedure. Attendees sign a register at the end. Toolbox talks are recommended for any site with an identified UXO risk and are often required under CDM documentation or principal contractor safety rules.

  • Yes, and this is often the most effective model for larger or longer-duration projects. A UXO consultant can be engaged from the risk assessment stage to advise on survey scope, review methodology, produce UXO-specific content for the Construction Phase Plan, provide watching brief resource during groundworks, and issue final ALARP documentation at project close. A single point of contact who understands the full project history avoids the gaps and inconsistencies that arise when services are procured piecemeal.

  • It depends on the building history and demolition method. Structural demolition that does not disturb the ground typically carries lower UXO risk. However, buildings with basements, foundations requiring breaking out, or suspected wartime damage and repair may require supervision during sub-structure removal. A pre-demolition risk assessment will clarify whether supervision is warranted and at what stage it should begin.

  • At a minimum, the specialist should hold a recognised EOD or EOC qualification from a military or IExpE-accredited programme, have direct experience of the ordnance types relevant to your project area, and carry appropriate professional indemnity and public liability insurance. The company should operate in accordance with CIRIA C681/C785 and HSE guidance for commercial EOD operations. Always ask for evidence of these credentials; competence in this field is non-negotiable.

  • Ground investigation firms are geotechnical specialists; their competence lies in soil sampling and testing. UXO risk management requires a distinct skill set: knowledge of wartime ordnance, operational EOD capability, and familiarity with the CIRIA C681 compliance framework. While some geotechnical firms partner with UXO specialists, it is important to verify that the person responsible for UXO advice holds the appropriate UXO/EOD qualifications, not simply a geotechnical licence.

S.I UXO has supported a range of our projects, including active and former MOD facilities. They deliver agreed scopes effectively and operate both professionally and with clear intent to minimise any disruption to ongoing works.

David Pethica /Director, Ground Condition Consultants Ltd

I've been impressed with S.I UXO's work attitude and quality. They have incredibly worked well with our site engineers and drillers, ensuring minimal disruption to our ground investigation works. I will certainly be using S.I UXO in the future.

Niall Kiernan /Project Manager, SOCOTEC UK Ltd

I've had the pleasure of working with S.I UXO over the past two years, I can confidently say that their performance has been nothing short of exemplary. I highly recommend S.I UXO for any UXO project that demands the utmost in reliability and professionalism.

Paul Standish /Associate Director, Terra Firma Group

Ready to de-risk your site?

Whether you need a 24-hour Preliminary Risk Assessment, a full survey, or just advice on your site; start with a conversation.

  • Senior engineers, start to finish
  • CIRIA C681 compliant
  • UK-wide coverage

Book a UXO watching brief or consultancy for expert oversight of your groundworks programme.